While I was in Minnesota for the past 10 days, Doug worked on our master bathroom in the evenings.
This is a Before shot of the bathroom with the wallpaper still in place.
This is a Before photo of the wall damage to the cornerbead by the tub.
This is now more visible since the foundation work was completed.
This is workday number # 1
Repairing the cornerbead and starting to remove the wallpaper border.
Repairing the cornerbead and starting to remove the wallpaper border.
All the wallpaper border is down.
Plastic covered all the fixtures and resin paper is covering the marble floor.
Plastic covered all the fixtures and resin paper is covering the marble floor.
Doug needed to work by the table lamp as the
bathroom bar lights were underneath the plastic.
Prepping for paint.
"X" Marks the spot or at least the outlet so he wouldn't switch on the bar lights,
that were underneath the plastic covering.
that were underneath the plastic covering.
Finishing painting.