Happy Halloween!!!
Tuesday, October 31, 2017
Saturday, October 28, 2017
Saturday, October 21, 2017
Crab Cakes
Today is my first time trying my friend Kim's Crab Cake recipe.
Lump crab purchased from Costco
Going in to the pan
Completed and ready to eat!
Served with wine!
See recipe below!
See recipe below!
My 1st boots
Monday, October 16, 2017
Pool Remodel
We started the pool removed on October 16th. It was about a 2 month process as the plasterers would have to come out twice, the plumber came out twice and the masons came out twice...but it is done and will be fun to enjoy this summer!
Day 1 (Draining the pool)
Day 2 (Prep Work)
Day 3 (Making our own custom tile inserts)
The plasters saved parts of our original tile inserts, we purchased tile backing
and created our own inserts for installation later in the week.
and created our own inserts for installation later in the week.
Day 4 (Plaster complete)
Andrew is checking out the deep end!
Day 5 (Plumbing work)
Day 5 (Plumbing work)
In the course of the prep work, spa jets were damaged
and needed to be repaired before the spa could be plastered.
and needed to be repaired before the spa could be plastered.
After this step, the spa was plastered.
The coping was repaired and then repaired again.
This caused mortar to be mixed with the plaster when it was setting up.
The pool was then sanded by our project manager but later the pool would need to be emptied again.
The pool was then acid washed and then refilled for the 2nd time.
Then a long few months of water balancing (pH and chlorine)
Anxiously waiting for warmer days to use the pool.
Sunday, October 15, 2017
Friday, October 13, 2017
Student of the Month
Check out Ms. Martin's Lobo Rumbler (student of the month), Andrew Elliott!!
A special cupcake for Andrew from Mimi for all his hard work.
Subscribe to:
Posts (Atom)